外贸英语不用背词典,真正天天用的就那100来句。这篇按询盘、报价、物流、付款四个场景拆开给你,每句带中文对照,再讲几个我踩过的坑。看完直接抄去用。
一、询盘回复:前3句定生死
客户发来询盘,你回得慢或者回得虚,单子基本就凉了。高频句先记这几条:
- Thanks for your inquiry. Could you confirm the target quantity and destination port?(感谢询盘,能否确认目标数量和目的港?)——别急着报价,先摸清底牌。
- We can offer a competitive price for orders above 500 pcs.(500件以上我们可以给有竞争力的价格。)
- Could you share more details on the specification, such as material and size?(能否提供更多规格细节,比如材质和尺寸?)
坑在哪?新人爱回「We are a professional manufacturer with 10 years experience」一大段公司介绍,客户看三行就关了。老手做法:第一句确认需求,第二句给一个大概价格区间(比如 USD 2.5–3.2/pc, depending on quantity,大概这个范围),第三句抛一个问题把对话续上。
真实片段:客户问「What's your best price for 1000 pcs?」新人直接报底价,客户消失。老手回:「For 1000 pcs, our price is around USD 2.8/pc FOB Ningbo. If you can take 2000 pcs, we can do USD 2.5. Which quantity works better for your market?」——把价格和数量绑一起,客户自己往上加。
二、报价与还价:留台阶,别硬刚
报价最怕报完没下文。高频句:
- This price is valid for 15 days.(此价格有效期15天。)——给个期限,逼客户动。
- Our price is based on MOQ of 500 pcs. For smaller quantity, the unit price will be around 10% higher.(报价基于500件起订,量小单价大概高10%。)
- I understand your target price, but that's below our cost. Can we meet in the middle at USD 2.7?(理解你的目标价,但低于成本。各让一步到2.7如何?)
还价时别说「This is our rock-bottom price」把路堵死。留一句 Let me check with my manager and get back to you tomorrow.(我跟经理确认下,明天回复你。)——既显得认真,又给自己留了降价空间。客户砍价狠的时候,用 If we accept this price, can you increase the quantity to 2000 pcs? 把让价换成加量,这招屡试不爽。
三、物流沟通:时间节点说清楚
物流环节最容易扯皮,句子要具体到天和港:
- Lead time is around 25–30 days after deposit received.(收到定金后交期大概25到30天。)
- We'll ship from Ningbo Port. The ETD is around March 15, ETA around April 20.(宁波港出,预计3月15日开船,4月20日到港。)
- Could you confirm the shipping mark and consignee details before booking?(订舱前能否确认唛头和收货人信息?)
坑:只写「We will ship soon」,客户天天催。正确做法是给节点——Booking confirmed, container will be loaded on March 10. I'll send you the B/L copy within 3 days after sailing.(订舱已确认,3月10日装柜,开船后3天内给提单副本。)客户要的就是确定性。
四、付款条款:丑话说前头
付款谈不拢,前面全白干。高频句:
- Our standard payment term is 30% T/T deposit, 70% before shipment.(标准付款是30%定金,70%发货前付清。)
- We also accept L/C at sight, but the bank charges are on your side.(也接受即期信用证,但银行费用由你方承担。)
- The deposit needs to be received before we start production. Could you send the bank slip once done?(收到定金才安排生产,付完能否发水单?)
遇到客户拖尾款,别只说「Please pay」。用 According to our agreement, the balance should be settled before March 10. Otherwise the shipment will be delayed and may affect your selling season.(按约定尾款3月10日前结清,否则船期延误可能影响你的销售季。)——把后果说清楚,比催十遍管用。
收个尾
这四组句子覆盖了八成日常沟通,剩下的靠场景里滚。行动建议:今天就把你最近三个客户邮件翻出来,对照上面的句型改一遍回复,存成模板。下次询盘进来,十分钟内发出去,比背一百个单词实在。
💬 评论(0)